The client had sent us Conceptual sketch. The drawings had to be converted to High quality surfacing within model and rendered images.
2. Volume : Single quantity
3. Turnaround Time : 10 hours
4. Software Used : Pro/Engineer
5. Challenges faced during execution :
This project required to build up high quality surfaces for production purpose. It was very difficult to maintained dimensional shapes and size to pass and catch a very hard rubber ball.







