The design should meet the recommended NEC and CAD standards. All application areas should have appropriate illuminations. The client had sent us the following :
- Layout
- Fixture Schedule and Application area, mounting details and fixture specification.
- Sample file for CAD Standards and symbols.
- Operational Specification i.e Switch control, sensors etc.
- Details of local code to be followed.
3. Turnaround Time : Continuous work for 6 months
4. Software Used : Auto CAD 2007
5. Challenges faced during execution :
The core requirement for the project was the product knowledge of what should be used and where. Further, the important aspect and the challenge were the integration and adaptability of the products with the system and with each other. However, we were able to successfully make modifications in the system.